x

Pitch and Turnstile Planning Permission Granted - Ipswich Town News

Town’s plans for the installation of a new Portman Road pitch and new turnstiles for the Sir Alf Ramsey Stand have been approved by Ipswich Borough Council

The club began work on improving the ground last summer with a big screen installed, a new access point in the corner between the Cobbold Stand and the Sir Alf Ramsey Stand, and new dugouts.

The current plans, drawn up by local architects Hoopers, a long-time partner of the club, were approved just before Christmas having been submitted early in November.

The second phase of the improvements have three principal elements. Provision of new turnstile access and egress from the Sir Alf Ramsey Stand via the land the club purchased to the south of the stadium last year, demolition of the existing turnstiles to the east and west of the Sir Alf Ramsey Stand and the new Desso [hybrid natural grass and artificial fibre] playing surface, including plant and equipment for the provision of pitch irrigation, surface water attenuation and undersoil heating.

The plans submitted to IBC indicate that the width of the pitch - which is currently 66m wide by 102m long - will increase by 40mm and will also be longer, while moving closer to both end stands, more towards the Sir Alf Ramsey Stand.

The dimensions of the new pitch will be around 66m x 106m, although that isn’t stated. The halfway line will now be between the home and away dugouts, having been off-centre for some years.

The whole pitch moves slightly towards the Cobbold Stand, while the boundary Astroturf, which is being replaced, will be narrower than at present with more grass around the edge of the pitch.

The plans state that the surface will also be raised slightly on the Cobbold Stand side: "The opportunity will be taken to create a more level surface. The pitch currently slopes down from west to east, as such the pitch will be lifted on the east side accordingly.

"This will provide a surface which plays better, drains better and gives some improvement to sight lines on the east side of the stadium.”

Thanks to TWTD Forum poster Muncher for his help with this story.

What to read next:

Rowett: We've Performed Quite Well in the Last Two Games
Oxford United boss Gary Rowett says dropping into the bottom three doesn’t change much for his side ahead of the Blues’ visit to the Kassam Stadium on Friday evening (KO 8pm).
[Podcast] Blue Monday - New Podcast Now Online
A new podcast from the Blue Monday team is now available.
[Podcast] Life's a Pitch TV - New Podcast Now Online
A new podcast from the Life's a Pitch TV team is now available.
Ashton: We've Requested Meetings With Transport Authorities
Town CEO and chairman Mark Ashton says the club are looking to speak to National Highways and Greater Anglia regarding transport arrangements to and from Portman Road matches.
Ashton: We'll Now Move to More Detailed Work on Cobbold Stand Plans
Blues chairman and CEO Mark Ashton has outlined in more detail where the club currently stands on the redevelopment of the Cobbold Stand.
Friday Night Derby Under Discussion
The possibility of a Friday night East Anglian derby at Carrow Road in April is under discussion due to railway engineering work over the weekend of the match when the Blues will be looking to secure their first double over their rivals from across the border since the the inaugural 1992/93 Premier League campaign.
McKenna: We Have to Recover Quickly and Go to Oxford With a Big, Big Attitude
Town visit Oxford United on Friday night for what manager Kieran McKenna says feels like a second midweek away game, the Blues having won 2-0 at Hull City on Tuesday (KO 8pm, Sky Sports).
Town to Introduce Rules For No-Show Season Ticket Holders
Town chairman and CEO Mark Ashton says the club will be introducing new rules to address non-attendance by season ticket holders, revealing that 6,000 fans have added their names to the waiting list launched last month.
Ashton: We're Putting in a Complete New PA System
Blues CEO and chairman Mark Ashton says the club will be spend around £1 million on a new PA system to finally resolve the ongoing issues.
New Office Hub and Boardroom at Portman Road
Town’s staff will move into a new office hub in the old gym at Portman Road in January, which is currently under construction along with a new boardroom.