| Promotion/Ground improvements 13:22 - May 1 with 3127 views | EssexBloo | Will we crack on with plans for a new tier over the West Stand this summer or is it still a long term thing? *assuming this is the plan before they then do the Cobbold. |  | | |  |
| Promotion/Ground improvements on 13:24 - May 1 with 2793 views | blueprint | No the plan is that should we not get promoted the ground will be de-developed to pre 1938 standards with the chicken run getting reinstalled. Def info. |  | |  |
| Promotion/Ground improvements on 13:53 - May 1 with 2588 views | Marshalls_Mullet | Do you mean progress the design process? Or start the build? They will be a long way off from being able to commence any kind of construction. |  |
|  |
| Promotion/Ground improvements on 14:10 - May 1 with 2456 views | Kievthegreat | They could crack on with submitting plans for a new tier over the West Stand. But without any planning permission or the HUGE logistics in place, there is absolutely zero chance of that sort of construction this summer. [Post edited 1 May 15:22]
|  | |  |
| Promotion/Ground improvements on 14:25 - May 1 with 2326 views | EssexBloo |
| Promotion/Ground improvements on 13:53 - May 1 by Marshalls_Mullet | Do you mean progress the design process? Or start the build? They will be a long way off from being able to commence any kind of construction. |
Yes I was thinking whether they would start submitting plans, then maybe start work next summer? |  | |  |
| Promotion/Ground improvements on 14:41 - May 1 with 2263 views | Vic | If we win tomorrow ...! It should be helpful that we won't be faced with 101 jobs to meet prem requirements this time round. Be good to hear much more about the building of the playing squad and the club, than blocked up stairs, how many miles of cabling, etc, etc. I really, really hope the scouting network has been in place long enough for us to get in a much stronger group of players this time round. But let's win tomorrow first and then we can all start the speculation! |  |
|  |
| Promotion/Ground improvements on 15:30 - May 1 with 2101 views | algy |
| Promotion/Ground improvements on 14:41 - May 1 by Vic | If we win tomorrow ...! It should be helpful that we won't be faced with 101 jobs to meet prem requirements this time round. Be good to hear much more about the building of the playing squad and the club, than blocked up stairs, how many miles of cabling, etc, etc. I really, really hope the scouting network has been in place long enough for us to get in a much stronger group of players this time round. But let's win tomorrow first and then we can all start the speculation! |
As well as the benefits of the upgraded scouting network we should in the summer window see the benefit of the upgraded training ground. We were told when the investment was announced that it was needed to attract new signings, implying that as it was it was putting potential off. Hard to believe as surely the chance to work with KMc would be more than enough, but we'll see. |  |
| Never forget that on 7th. April 2021, for ITFC, the Game Changed. |
|  |
| Promotion/Ground improvements on 15:35 - May 1 with 2078 views | Zx1988 | We could even upgrade the Chairman/CEO. |  |
|  |
| Promotion/Ground improvements on 15:38 - May 1 with 2067 views | LA_Tractor_Boy | No, but the club will have to install a new PA system which I think is planned anyway. VAR announcements weren't a thing last season, but I assume PL requirements now state that stadium speakers must be clear and audible. |  | |  | Login to get fewer ads
| Promotion/Ground improvements on 16:42 - May 1 with 1925 views | tetchris | MA said the new tannoy system is going to cost a million. Improvements to expand the stadium are a bit more long term. New stands or extensions to existing requires planning etc and unlikely until season after next at earliest. Replacement of the Churchman’s is going to be very expensive so extensions to other stands will be needed first to accommodate all those fans who will have to forgo their seats in the churchman’s until the new stand is completed. Demolition would have to begin literally the day after the season ends and it may be possible to open lower tiers before the stand is completed in full. The plus side of building a new stand is the fact that the structure can be built quite quickly as it’s mostly steel and concrete. Fit out of the concourses etc takes most of the construction time |  | |  |
| Promotion/Ground improvements on 16:49 - May 1 with 1898 views | farkenhell |
| Promotion/Ground improvements on 16:42 - May 1 by tetchris | MA said the new tannoy system is going to cost a million. Improvements to expand the stadium are a bit more long term. New stands or extensions to existing requires planning etc and unlikely until season after next at earliest. Replacement of the Churchman’s is going to be very expensive so extensions to other stands will be needed first to accommodate all those fans who will have to forgo their seats in the churchman’s until the new stand is completed. Demolition would have to begin literally the day after the season ends and it may be possible to open lower tiers before the stand is completed in full. The plus side of building a new stand is the fact that the structure can be built quite quickly as it’s mostly steel and concrete. Fit out of the concourses etc takes most of the construction time |
Presume you mean Cobbold? Or the East Stand to us old timers. |  | |  |
| Promotion/Ground improvements on 17:04 - May 1 with 1836 views | flykickingbybgunn |
| Promotion/Ground improvements on 13:24 - May 1 by blueprint | No the plan is that should we not get promoted the ground will be de-developed to pre 1938 standards with the chicken run getting reinstalled. Def info. |
Does that mean the old corrugated bogs with no roof and cracked troughing are coming back ? Ethnic. |  | |  |
| Promotion/Ground improvements on 17:50 - May 1 with 1719 views | Illinoisblue |
| Promotion/Ground improvements on 16:42 - May 1 by tetchris | MA said the new tannoy system is going to cost a million. Improvements to expand the stadium are a bit more long term. New stands or extensions to existing requires planning etc and unlikely until season after next at earliest. Replacement of the Churchman’s is going to be very expensive so extensions to other stands will be needed first to accommodate all those fans who will have to forgo their seats in the churchman’s until the new stand is completed. Demolition would have to begin literally the day after the season ends and it may be possible to open lower tiers before the stand is completed in full. The plus side of building a new stand is the fact that the structure can be built quite quickly as it’s mostly steel and concrete. Fit out of the concourses etc takes most of the construction time |
How can a tannoy system cost a million pounds? Madness. |  |
|  |
| Promotion/Ground improvements on 19:01 - May 1 with 1603 views | backwaywhen |
| Promotion/Ground improvements on 14:10 - May 1 by Kievthegreat | They could crack on with submitting plans for a new tier over the West Stand. But without any planning permission or the HUGE logistics in place, there is absolutely zero chance of that sort of construction this summer. [Post edited 1 May 15:22]
|
Contract priced and won by a local company already ….watch this space . |  | |  |
| Promotion/Ground improvements on 20:24 - May 1 with 1401 views | urbanpenguin |
| Promotion/Ground improvements on 17:50 - May 1 by Illinoisblue | How can a tannoy system cost a million pounds? Madness. |
What is your budget for a Tannoy system for a Premier League ground, and can I see your calculations? |  | |  |
| Promotion/Ground improvements on 20:26 - May 1 with 1394 views | Zx1988 |
| Promotion/Ground improvements on 17:50 - May 1 by Illinoisblue | How can a tannoy system cost a million pounds? Madness. |
|  |
|  |
| Promotion/Ground improvements on 21:00 - May 1 with 1319 views | farkenhell |
| Promotion/Ground improvements on 17:50 - May 1 by Illinoisblue | How can a tannoy system cost a million pounds? Madness. |
Sounds like a job for Megaphone Man. |  | |  |
| Promotion/Ground improvements on 21:35 - May 1 with 1211 views | stonojnr | not a chance, its a long term thing, stability in the Premiership would allow it to happen quicker than constantly yo-yo-ing between leagues if that indeed ends up being the pattern for the club over the next 5 years. |  | |  |
| Promotion/Ground improvements on 22:41 - May 1 with 1077 views | Illinoisblue |
| Promotion/Ground improvements on 20:24 - May 1 by urbanpenguin | What is your budget for a Tannoy system for a Premier League ground, and can I see your calculations? |
I’ll give you 400k, 100k for each stand. When can you start? |  |
|  |
| Promotion/Ground improvements on 23:19 - May 1 with 981 views | ParisBlue | I was told that immediately after the final game (hopefully tomorrow) that work would start on expanding the Pioneer stand by an extra 7000 seats, the same capacity as the Cobbold currently. |  |
|  |
| Promotion/Ground improvements on 00:07 - May 2 with 926 views | yesjohn99 |
| Promotion/Ground improvements on 23:19 - May 1 by ParisBlue | I was told that immediately after the final game (hopefully tomorrow) that work would start on expanding the Pioneer stand by an extra 7000 seats, the same capacity as the Cobbold currently. |
I’ve heard that too, from a very reliable source. But I just refuse to believe it! |  | |  |
| Promotion/Ground improvements on 05:23 - May 2 with 821 views | witchdoctor |
| Promotion/Ground improvements on 00:07 - May 2 by yesjohn99 | I’ve heard that too, from a very reliable source. But I just refuse to believe it! |
well if they do crack on with it hopefully there won’t be so many RV seats in there… |  | |  |
| Promotion/Ground improvements on 08:56 - May 2 with 539 views | LegendofthePhoenix |
| Promotion/Ground improvements on 13:24 - May 1 by blueprint | No the plan is that should we not get promoted the ground will be de-developed to pre 1938 standards with the chicken run getting reinstalled. Def info. |
Is the chicken run still at Foxhall Stadium? I hope they’ve looked after it for us. |  |
|  |
| Promotion/Ground improvements on 09:07 - May 2 with 490 views | backwaywhen |
| Promotion/Ground improvements on 08:56 - May 2 by LegendofthePhoenix | Is the chicken run still at Foxhall Stadium? I hope they’ve looked after it for us. |
No in a nutshell. |  | |  |
| Promotion/Ground improvements on 09:33 - May 2 with 410 views | Zx1988 |
| Promotion/Ground improvements on 00:07 - May 2 by yesjohn99 | I’ve heard that too, from a very reliable source. But I just refuse to believe it! |
It would be incredibly foolish/arrogant of the club. They'd be gambling millions on retrospective planning for both the works, and the precise design. Unless, of course, they've already had productive talks with the Council, but that's a road I'd absolutely hate for us to go down. |  |
|  |
| Promotion/Ground improvements on 09:38 - May 2 with 388 views | FrimleyBlue |
| Promotion/Ground improvements on 14:41 - May 1 by Vic | If we win tomorrow ...! It should be helpful that we won't be faced with 101 jobs to meet prem requirements this time round. Be good to hear much more about the building of the playing squad and the club, than blocked up stairs, how many miles of cabling, etc, etc. I really, really hope the scouting network has been in place long enough for us to get in a much stronger group of players this time round. But let's win tomorrow first and then we can all start the speculation! |
lol, that stair to nowhere was such a peak ipswich banter era thing to see. |  |
|  |
| |